Construction accounting for industrial and commercial contractors

Job costs should be visible before the client invoice arrives. For contractors across Canada and the United States, that starts with a reliable field record—not another month-end spreadsheet.

By KADEFIRE · For contractor owners, project teams and accounting staff

Industrial facility with equipment and pipework
Industrial and commercial jobs need a clear connection between field activity, job costs and billing.

Construction accounting connects the work performed on each job to its costs, client billing, supplier obligations and cash. A company-wide profit figure alone cannot tell you which work order is overspending or which completed work is still waiting to be billed.

01

Start with the job, not the invoice

Set up the job with its customer, contract model, scope and cost structure. Then create work orders for the work your crews will perform. Consistent job and work-order references make it possible to follow a cost from the field through to the books.

In KADEFIRE, the operating chain is Job → Work Order → LEMS tickets → Client Invoice. Tender and contract information establish the scope; the work order connects daily activity to that scope. Keep internal cost, client charge-out rates and the agreed selling price separate.

Review three different amounts: the budget, outstanding purchasing commitments, and costs actually incurred. An open purchase order is a commitment—not a material ticket proving consumption. A client invoice is a billing event—not proof that all job costs have been captured.

02

Capture the day in Labour, Equipment, Materials and Services

LEMS gives field crews and accounting staff a common language for the resources a job consumes. Capture quantities, descriptions and the correct work order while the work is fresh, then obtain the required review and sign-off.

Labour
Crew hours, role, time category and work description. Keep the hours performed distinct from the rates used to cost or bill them.
Equipment
Equipment used, duration and applicable rate. Review utilization alongside job cost, rather than assuming every asset is earning its keep.
Materials
Items and quantities consumed, with stock issues or purchasing records behind the cost. Retain line-item detail for both chargeable and non-chargeable materials.
Services
Third-party work, rentals and other services tied to the work order, with their supporting records.

KADEFIRE’s free field-entry subscriptions let on-site foremen and personnel capture these categories and raise material requisitions. Paid full-access seats remain separate from field-entry-only users.

03

Fixed bid and T&M need different billing controls

Fixed bid: protect scope and compare bid to actual

The contract price is not the same thing as your internal cost. Track signed LEMS against the job budget, manage changes to scope, and prepare progress claims against the agreed schedule of values. In KADEFIRE’s unit-installed workflow, field surveys support the completion quantities used for claim earnings; typing a completion percentage is not a substitute for that evidence.

Confirm the service period, approved changes and applicable holdback or retainage before preparing a claim. The contract and local requirements determine the treatment—do not assume one rule applies across North America.

T&M: make every billed charge traceable

Use the agreed rates and charge rules with authorized work orders and signed supporting tickets. A client should be able to follow an invoice charge back to the hours, equipment, materials or services behind it. Keep non-chargeable costs visible internally so a clean invoice does not hide margin erosion.

Both models depend on the same reliable field record. What changes is how that record supports the client’s bill: agreed progress and scope for fixed bid, or auditable quantities and rates for T&M.

04

Treat inventory as a full module, not a materials total

Track stock by building, yard or truck. Receipts, issues to work orders, transfers, counts and adjustments explain both where materials are and why the balance changed. A material requisition records a need; an issue records stock leaving inventory for the work.

KADEFIRE supports FIFO cost layers and inventory valuation. With FIFO, issued materials draw their cost from the oldest available layers. Use the inventory journal and source movements to reconcile valuation, rather than treating today’s supplier price as the cost of every item already held.

For purchasing, compare the purchase order, receipt and supplier invoice. Check quantities, costs and receipt status before approving a supplier bill for accounting. Outstanding P.O. lines remain commitments until the corresponding work or receipt supports an incurred cost.

When received warehouse materials are assigned to a work order in KADEFIRE, use the receipt-to-ticket workflow. Do not also enter a separate stock issue for the same assignment: the workflow records the stock reduction and work-order cost together.

05

Connect approvals to client billing

Review tickets and authorize the work order before selecting it for invoicing. Check the customer address, billing description, service dates, tax code and supporting detail. KADEFIRE follows an Open → Approved → Submitted → Paid invoice lifecycle; editing belongs in the Open stage.

For clients reviewing work, KADEFIRE’s project-owner site provides visibility at the work-order and ticket level for contractors using KADEFIRE, with approval of LEMS tickets, work orders and invoices. That makes cost conversations possible before the invoice arrives.

Keep deposits separate from earned charges

When an upfront deposit is applied as a payment against an invoice, show the full charges and tax, then show the payment deduction and remaining balance. Do not reduce the work performed simply to make the balance due smaller.

Illustrative invoice settlement

An invoice of $19,500 with a $15,000 payment applied leaves $4,500 due, assuming no tax or holdback in this example. The charges remain $19,500.

Deposit invoicing, tax timing and revenue recognition can vary. Confirm the accounting treatment with your accountant. In KADEFIRE, applied payments protect invoice amounts; use the correction workflow rather than expecting a paid invoice to silently change when work-order details are edited.

06

Connect billing to accounts receivable, payable and the ledger

KADEFIRE’s built-in accounting suite includes accounts receivable, accounts payable, the general ledger and bank reconciliation. Before posting, configure the appropriate accounts and tax codes, approve source documents, and resolve mismatches. Invoice approval and ledger posting are distinct steps—check both.

Track earned work, invoiced amounts, payments received and the remaining receivable separately. Likewise, a purchase commitment, a supplier bill and a supplier payment describe different stages. Reconciling those stages is more useful than combining them into one “spent” number.

For Canadian jobs, configure the relevant GST/HST/PST treatment. For US jobs, configure applicable state sales tax. Taxability, exemptions, retainage and revenue recognition depend on the jurisdiction, contract and business circumstances; software settings do not replace professional advice.

If your business keeps QuickBooks Online, KADEFIRE offers daily sales and purchase exports as an alternative to using its built-in books. Review export history and use audited recall when correcting an exported record to avoid duplicate accounting entries.

07

A weekly review that starts in the field

  • Confirm daily LEMS are complete and identify tickets still awaiting approval.
  • Compare actual costs and outstanding P.O. commitments against the job budget without double-counting them.
  • Review equipment utilization, non-chargeable costs and material issues for unexpected cost or margin changes.
  • Find authorized work orders not yet invoiced, and check field surveys and service periods for progress claims.
  • Resolve supplier-invoice differences against orders and receipts before posting.
  • Review open receivables, applied deposits and bank reconciliation; confirm approved documents have the intended ledger posting.

Start with one active job and one week of field records. Check whether you can trace a client charge back to its ticket and a material cost back to its stock movement or purchasing evidence. Close those gaps before expanding the process.

Further reading

This guide describes KADEFIRE’s operating workflows, not legal or tax advice. For general construction-accounting concepts, see Procore’s Introduction to Construction Accounting, Job Costing and T&M vs. Fixed Fee Contracts.